We've demolished hundreds of decks. We know how to do this safely and efficiently.
We evaluate what you've got. Size, construction method, attachment to house, footing depth. We identify any structural concerns before starting demolition.
We work from top down. Railings come off first. Then decking boards. Then joists. Then beams. Then posts and footings. We dismantle systematically rather than just attacking it randomly.
If your deck is attached to your house, we disconnect it carefully. We protect siding, windows, and doors during demolition. We're not damaging your house to remove the deck.
We remove posts and concrete footings completely. We dig them out or break them free. The goal is getting everything below ground level so your yard is usable.
We load all materials—wood, composite, concrete, metal—and haul everything away. We dispose of materials appropriately.
We fill holes from footing removal. We grade the area reasonably. We remove debris. The space should be ready for whatever you're doing next—new deck, landscaping, or just open yard.
We give you a firm price after assessing the deck. You know what it costs before we start tearing anything down.
Nearly two decades of deck removal. We've demolished everything from small apartment balconies to massive multi-level deck systems.
Decking, framing, posts, concrete footings—it all comes out. We don't leave posts or concrete in your yard.
We disconnect decks from houses carefully. We're not ripping ledger boards off and damaging your siding or framing.
Need that deck down this week? We offer same-day service when our schedule allows.
We're locally owned. No corporate fees. We work with realistic budgets for deck removal projects.
Deck removal pricing depends on size, construction, and complexity.
Small single-level decks cost less than large multi-level structures. Ground-level decks are simpler than elevated decks requiring extensive support. Easy yard access is cheaper than situations requiring hauling through houses.
Attachment to house affects pricing. Simple bolt-on ledgers are easier to disconnect than decks integrated with home framing or roofing.
We need to see what you've got for accurate pricing. Photos help but we prefer in-person assessment for decks. Once we evaluate the structure, we'll give you an exact price before starting demolition. If you agree, we can often start quickly—sometimes same-day or next-day.
Replacing old deck with new. The old deck has to come down first. We remove it completely so deck builders have a clean workspace.
Eliminating unsafe deck. It's rotting and dangerous. You're not rebuilding. We remove it so it's no longer a liability.
Selling property and deck is an issue. Buyers want it gone or inspectors flagged it as unsafe. We remove it before closing.
Expanding indoor living space. You're building an addition where the deck is. We remove the deck so contractors can proceed.
Code violation or safety concern. City or HOA wants the unsafe deck addressed. We remove it to resolve the issue.
Most deck removal projects are completed in one to two days.
Small decks (under 200 square feet) usually take a single day. Larger or multi-level decks may require two days depending on complexity.
⏱ household contents may take a full day.
We work efficiently but safely. We’re not rushing demolition and creating hazards.
🚚 You need that property turned around fast and we work accordingly.
We don’t drag projects out. Once we start an eviction cleanout, we finish it.
🚚You need that property turned around fast and we work accordingly.
AAA Rousse Deck Removal Services
Since 2006